An ERP diagnostic grounded in the real paperwork
Two days on site with an Algerian fabricator of pressure vessels, tanks and silos, mapping every department, then a clickable prototype built from their own documents and a written proposal for a phased, multi-site ERP.
FPCP Industrie fabricates pressure vessels, fuel and water tanks, drilling-mud tanks, silos and stainless equipment from its works in Réghaïa, east of Algiers. Its customers include major names in Algerian oil and gas and large industrial contractors, which means demanding specifications, formal tenders and certification on almost every job.
The skill on the shop floor was never in doubt. What the business lacked was a shared operational record. Stock was reconciled for the accounts but not tracked as it moved. Enquiries lived in a notebook. Production was launched by word of mouth, certificates were pulled from binders by hand, and material moving between sites did so off the record.
The owner wanted a clear view of how the whole operation should run and what a system to support it would involve. The first job was to understand the business well enough to say what should come first.
We ran a two-day on-site discovery from a department-by-department field playbook: direction, technical office, production, stores and purchasing, commercial and tenders, quality and certification, logistics, maintenance, finance, HR and IT, closing with a readout to management.
Every finding was logged as a pain point, a control gap or an open item, and we kept a strict line between what we saw evidenced and what we were told. Real documents were requested and reviewed in batches: a complete quote-to-delivery cycle for one order, the quotation workbook, the annual stock recap, a pressure-vessel certification dossier and the attendance export.
Those documents shaped the prototype and the scope. The quotation workbook defined the costing engine any ERP would have to reproduce, the stock recap gave us the item master in FPCP's own vocabulary, and the certification dossier showed the need for a calibration register with due dates.
Our written recommendation was one bespoke multi-site system, delivered module by module in three phases, with each module scoped on its own and the next only started once the previous one is live and in use.
Tell us what is actually happening.
No pitch deck. A conversation about the problem in front of you, and an honest view on what to do first. We usually reply the same working day.